Petition details
The new 56 apt development at Newtown ave was recently completed. During construction there was a loading zone installed which we would like reinstated.
It would be valuable to the residents and neighbouring businesses for these reasons:
- To make rubbish collection easier, quicker, and safer
- Moving in/out, to prevent crossing busy roads with heavy items
- Large deliveries, pick-up/drop-off
All the above are done either from the the bus stop on Constable st or nearby public parks
Background information
During construction of the 56 apartment (112 bedroom) site, a loading zone was established on Newtown ave. After the developers left it continued to be used by the residents until it was removed. For a number of reasons it would useful to have it re-instated.
See below link for full discussion of some of these.
https://docs.google.com/document/d/1q1QBSDoiElx7XfeXtNBjIqZHn7Cf6_4hjpayqN1V9po