Building consent fees are set by the Wellington City Council under the Building Act. They are reviewed annually.
BRANZ and Department of Building and Housing levies apply to all work valued at $20,000 or more. The BRANZ levy is currently $1.00 per $1,000. The Department of Building and Housing levy is $1.97 per $1,000. Where the consent is staged, the payable levy is assessed on the total project value.
This schedule includes building inspection services.
| Services | Charge ($) |
|---|---|
| Smallworks: Drainage/Plumbing | 256.25 |
| Smallworks: Free-standing fireplace | 166.25 |
| Smallworks: In-built fireplace | 357.50 |
| Lodging | 90.00 |
| Code Compliance Certificate | 90.00 |
| Project Information Memoranda (PIM): | |
| Where a PIM is requested you must also pay the lodging fee listed above. | |
| < $5,000 | 65.00 |
| $5001 - $12,000 | 130.00 |
| $12,001 - $50,000 | 195.00 |
| $50,001 - $250,000 | 260.00 |
| $250,001 + | 455.00 |
| Plan Check | |
| < $5,000 | 130.00 |
| $5,001 - $12,000 | 228.00 |
| $12,001 - $25,000 | 293.00 |
| $25,001 - $50,000 | 325.00 |
| $50,001 - $75,000 | 423.00 |
| $75,001 - $100,000 | 455.00 |
| $100,001 - $250,000 | 845.00 |
| $250,001 - $500,000 | 1170.00 |
| $500,001 - $1,000,000 | 1,950.00 |
| $1,000,000 + | 1,950.00 + 650 for each $500k or part thereof over $1,000,000 |
| Certificates of Acceptance (includes lodging fee & inspection deposit) |
|
| < $5,000 | 458.00 |
| $5,001 - $12,000 | 620.00 |
| $12,001 - $25,000 | 653.00 |
| $25,001 - $50,000 | 685.00 |
| $50,001 - $75,000 | 783.00 |
| $75,001 - $100,000 | 815.00 |
| $100,001 - $250,000 | 1,238.00 |
| $250,001 - $500,000 | 1,530.00 |
| $500,001 - $1,000,000 | 2,310.00 |
| $1,000,000 + | 2,310.00 + 1,010 for each $500k or part thereof over $1,000,000 |
| S77 Fees (buildings over two or more allotments) |
|
| Processing time | 130.00 |
| Legal costs | Actual cost |
| LINZ lodgement | Actual cost |
| Other Services | |
| Building Certificate (pre-requisite for liquor licence application) including 30-minutes processing time | |
| Where application received with application for town planning certificate | 130.00 |
| Where application received independently | 220.00 |
| Vehicle Access: linked to a building consent or resource consent | 260.00 |
| Vehicle Access: received independently | 405.00 |
| Vehicle Crossing Inspection Fee | 130.00 |
| Any additional Vehicle Crossing Inspection Fee over 1 hour | 130.00/hour |
| Amended Plan deposit (includes 60 minutes processing time) Additional processing fees will be charged at $130/hour. |
197.50 |
| Marquee Licenses: Consent | 130.00 |
| Marquee Licenses: Inspection (per hr) | 135.00/hour |
| Consultants Reports | actual cost |
| Compliance Schedule / Building Warrant of Fitness | |
| New Compliance Schedule (linked with Building Consent) | 130.00 |
| Alterations to Compliance Schedule (linked to Building Consent) | 97.50 |
| Amendments to Compliance Schedule | 225.00 |
| Building Warrant of Fitness - Annual Certificate | 135.00 |
| Building Warrant of Fitness Inspection (per hour) | 135.00 |
| Structural Fee / Producer Statements | |
| Structural fee for checking elements of specific design on projects comprising structural works, not supported by a producer statement for: | |
| Single element | 395.00 |
| Several separate elements | 560.00 |
| Major design aspects on project valued under $250,000 | 1,087.50 |
| Major design aspects on larger projects | 1,747.50 |
| Structural fee for checking elements of specific design on projects comprising structural works, supported by a producer statement for: | |
| Single element | 196.50 |
| Several separate elements | 278.75 |
| Major design aspects on project valued under $250,000 | 320.00 |
| Major design aspects on larger projects | 402.50 |
| Building Inspections | |
| Standard Inspection Fee: 45-minute inspection | 101.25 |
| Standard Final Inspection: 1 hour inspection | 135.00 |
| Engineering inspections (not covered by a Producers Statement), including fire engineering, structural engineering for unusual proposal, specific design | actual cost, plus 90.00 |
| Amusement Device (temporary approval) | |
| For one device, for the first 7 days of proposed operation or part thereof | 10.00 + GST |
| For each additional device operated by the same owner, for the first 7 days or part thereof | 2.00 |
| For each device, for each further period of 7 days or part thereof | 1.00 |
Department Details:
Building Consents & Licensing Services